Full connectivity across a complex, listed heritage site

Full-fibre and WiFi, delivered on time and within budget

Mount Congreve House and Gardens is a listed building and visitor attraction, with gardens, a cafe, glamping and a glasshouse across a large heritage site. Regional Broadband delivered full-fibre and WiFi connectivity across the whole estate, working with the care a protected building demands.

The challenge

Connectivity across a protected heritage site.

Mount Congreve needed full connectivity across a large, complex site, delivered without compromising a listed building.

A complex heritage site

Gardens, a cafe, glamping, a glasshouse and outbuildings spread across a large estate, all needing connectivity.

A listed, protected building

Installation had to be carried out with great care because of the building's listed status.

Full coverage, indoors and out

Connectivity was needed in the main building, the gatehouse, auxiliary buildings and outdoor areas.

Challenging on-site conditions

A heritage estate brings practical installation challenges that had to be solved on site.

What we delivered

Full-fibre and WiFi across the estate.

Regional Broadband designed and installed a complete fibre and WiFi network for the whole site.

  • Fibre to the site and main building

    Fibre to the grounds perimeter and a fibre run into the main building comms room.

  • 23 WiFi access points inside

    An internal WiFi network of 23 access points across the main building.

  • Fibre extended across the estate

    Fibre extended to the gatehouse, auxiliary buildings and outdoor areas, including the cafe residences, glamping and glasshouse.

  • 18 more access points outside

    Router terminations and a further 18 WiFi access points across the wider site.

  • 41 access points in total

    A complete full-fibre and WiFi network with 41 WiFi access points in all.

  • Installed with heritage care

    All work carried out with the care required for a listed, protected building.

The results

Delivered on time and within budget.

A three-year managed service, delivered to a standard the client did not think possible.

  • On time and within budget

    The project was delivered on time and within budget.

  • Met and exceeded deliverables

    Regional Broadband met and exceeded all deliverables and service levels.

  • Challenging issues solved

    A number of very challenging on-site issues were solved during delivery.

  • A three-year contract

    A managed connectivity contract running from January 2023 to January 2026.

In their words
They have proven their ability to deliver high-quality solutions and maintain excellent service standards… they solved a number of very challenging issues on-site and delivered a service to a level we did not think would be possible.
Sara Dolan CEO, Mount Congreve Gardens

Talk to us

Have a site like this?

Talk to Regional Broadband about connectivity for complex, multi-building or heritage sites, and we will help you scope it.